Smart 44's Commissioning
Connect Power Cables
The power supply cables go through the input cable inlet at the charger's bottom, and connect to the corresponding L1, L2, L3, N and PE terminals inside the charger. Please note that L1, L2, L3, N correspond to R, S, T, N phases
Check before Power-on
Please check the following before any operation
The charger’s location is easy for operation & repairing
Double confirm the charger is installed properly
AC input’s current leakage protection switch is reasonable.
No other stuff or component left on the top of the charger
Powering-on and lock charger
Turn on the breaker switch inside the charger and close the back door of the charger. Use the equipped keys to lock the charger.
a) Make sure all checking is done according to the above items.
b) Turn on the current leakage protection switch of AC input.
c) Power-on the charger and observe the LED indicator, which should be standby status.
d) Observe the screen display and the symbol on the top right corner. The screen should display as the following picture
LED Status Indicator Meaning